Insured · COI on request · Davis-Bacon project experience336-328-7284chrisbarrett@fiberopticservices4u.com
Fiber Optic Services 4ULLC · Milton, PA · Since 2022

Fusion splicing, OTDR testing and aerial construction.

For telecom carriers, ISPs and prime contractors. Owner-operated, with Fujikura splicers and an EXFO OTDR on every job, and construction partners for larger scopes.

Tube 1 · Blue

Fusion splicing

Precision fusion splicing of single-fiber and ribbon cable in aerial and underground closures, FDH cabinets, and splitter cabinets. Every splice is prepped, cleaved, dressed to spec, and verified before the case is closed.

Cable
Single-fiber · Mass-fusion ribbon
Environments
Aerial · Pedestal · Cabinet · Vault
Tube 2 · Orange

FTTH splitter and terminal work

Splitter module installation, terminal splicing, and no-light troubleshooting and repair for fiber-to-the-home builds. We keep subscribers lit and outages short.

Splitters
1x2 · 1x4 · 1x8
Paperwork
Redlines · Daily task sheets
Tube 3 · Green

OTDR testing and closeout

Bidirectional OTDR traces and loss testing with Fujikura and EXFO equipment. We deliver clean closeout packages and redlines so your network is documented and ready for turn-up.

Equipment
EXFO OTDR · Fujikura splicers
Delivered
Traces · Loss readings · As-builts
Tube 4 · Brown

Aerial and underground construction

Strand placement, lashing, and make-ready work by bucket-truck crews. Underground and larger construction scopes are delivered through our vetted partner crews under one point of contact.

Aerial
Strand · Lashing · Make-ready
Underground
Through partner crews
Span A–B · 1550 nm · bidirectionalSample trace
0123456 km-5-10-15dB1234
EventTypeDistanceLoss
1Fusion splice1.75 km0.03 dB
2Fusion splice3.62 km0.02 dB
3Connector5.20 km0.28 dB
4Fiber end5.76 km—
Illustration of the report format. Not from a real job.
Closeout

What comes back with every job.

Bidirectional OTDR traces, loss and power meter readings, labeled splices, and redlines and as-builts in your format, so your network is documented and ready for turn-up.

For primes and ISPs

Common questions.

How fast can you get a crew on site?

For splice call-outs in central Pennsylvania we can usually be on site same day or next morning. For scheduled FTTH work in Michigan, Iowa or Georgia we mobilize to the prime's schedule and travel with our own bucket trucks and splice gear.

What test documentation comes back with the job?

Bidirectional OTDR traces, loss and power meter readings, and a closeout package with redlines, delivered in the format your project requires. Fujikura fusion splicers and an EXFO OTDR are on every job, so the data reads the same from one span to the next.

Are you set up to work as a subcontractor?

Yes. We have subcontracted on Frontier and Windstream FTTH builds since 2022. We carry our own insurance, handle W-9 and onboarding paperwork up front, and bring vetted partner crews for underground and larger construction scopes so you keep one point of contact.

Have a scope ready? Send it over.

Request a quote